One company measures the property, designs the system, installs it, tests it and hands you the record. The audit is a standalone product you own outright, but you do not have to take it somewhere else to get the work done.
Slope and fall documented against measured elevations, not estimated by eye.
Identified, photographed and confirmed before a proposal is written.
Dated photographs of the property and observable off site flow, taken before anyone digs.
The system is tested at completion and the result is recorded.
Your copy of what was installed, where it runs, and where the cleanouts are.
Plain terms, in writing, with the design basis stated.
Issued after the audit, with the design basis and the verified discharge destination stated. Nothing is proposed until the water has somewhere lawful to go.
50 percent at contract execution and permit clearance. HOA approval status confirmed before we mobilize.
Utility locates on every excavation, without exception. Most projects run two to seven days.
40 percent at substantial completion of subsurface work, before restoration begins.
Flow testing, as built drain map, walkthrough. The final 10 percent is released against the documentation package, not against how the sod looks. Final 10% payment due
Payment terms are set out in the contract. Figures above are our standard schedule.
Annual inspection and maintenance, starts at $1,499 per property per year. One two-technician visit scheduled between January and May, ahead of storm season: flushing and camera review of up to 250 accessible linear feet, gutter and downspout performance verification, pump testing, erosion and settlement comparison, and an updated drainage map and condition report.
The Plan provides an annual measured inspection and priority scheduling. It does not include emergency response, gutter cleaning, pump replacement or repairs, which are quoted separately.
Warranty coverage requires the system to be maintained. The Plan satisfies that condition, as does maintenance by a qualified third-party contractor or documented owner maintenance.
The system is designed to improve management of ordinary stormwater runoff under documented site conditions. No drainage system can guarantee prevention of flooding, foundation movement or water intrusion during extreme weather, off site changes, system obstruction or events exceeding its design capacity.
Foundation moisture and elevation readings are comparative observations, not structural engineering, mold or environmental conclusions. Engineered drainage plans are prepared and sealed by a Texas licensed professional engineer where required.